KOW reference library

The terms behind the transaction.

From the first budget review to the next capital plan: clear definitions, practical examples, and the distinctions that matter in a project report.

Field reference

320 terms. Real project context.

General educational guidance—not a substitute for the contract, governing standard, lender requirements, or a project-specific assessment.

320 terms
Accessibility

Accessibility plan review

A review of design documents against the accessibility criteria included in an agreed scope. It identifies coordination issues and potential barriers before they are built.

Accessibility

Accessibility scoping

The provisions determining which spaces, elements, and quantities must meet specified accessibility requirements.

Accessibility

Accessible route

A connected route meeting the applicable accessibility requirements between the spaces and elements it serves. Compliance depends on the complete route, not just an isolated ramp or doorway.

Existing buildings

Adaptive reuse

Conversion of an existing building to a new use while retaining some or much of its existing structure.

Construction

Addendum

A formal supplement or revision to bidding or procurement documents, typically issued before the contract is executed.

Lending & investment

Advance rate

The percentage of an eligible cost or value that a financing arrangement allows to be funded.

Construction

AIA G702

A payment-application and certification form commonly used to summarize a contractor’s current request for payment. It presents contract adjustments, earned amounts, retainage, prior payments, and the balance requested.

Construction

AIA G703

The continuation sheet commonly paired with an AIA G702. It shows the schedule of values, work completed, stored materials, and remaining balance by line item.

Existing buildings

Air barrier

A connected system of materials and joints controlling unintended airflow through the building enclosure.

Environmental

All Appropriate Inquiries (AAI)

The federal environmental inquiry process relevant to certain CERCLA liability protections when acquiring property. A qualifying assessment is one part of a larger set of requirements.

Construction

Allowance

An amount included in a contract or budget for a defined scope whose final selection, quantity, or cost has not yet been established. It is tied to an identified item rather than general uncertainty.

Accessibility

Alteration (accessibility)

A change to an existing building or facility that may trigger accessibility requirements under the governing rules. Its treatment depends on the nature and scope of the work.

Construction

Alternate bid

A separately priced addition, deduction, or substitution to the base scope offered during bidding.

Construction

Architect field report (AFR)

An architect’s written record of a site visit, observations, and items requiring follow-up under the agreed construction-phase services.

Lending & investment

As-complete value

A valuation premise describing a property with specified construction or improvements assumed complete.

Environmental

Asbestos-containing material (ACM)

Material containing asbestos as defined by the applicable regulatory or analytical framework. Appearance alone does not reliably establish whether a material contains asbestos.

Reports & due diligence

Assessment limitations

The boundaries and constraints affecting an assessment, including agreed exclusions, inaccessible areas, missing records, and the nature of the methods used.

Standards & guidance

ASTM E1527 — Phase I ESA

An ASTM practice for Phase I environmental site assessments of commercial real estate, focused on identifying recognized environmental conditions.

Standards & guidance

ASTM E1903 — Phase II ESA

An ASTM practice providing a framework for Phase II environmental site assessment, including investigation of potential contamination.

Standards & guidance

ASTM E2018

An ASTM guide describing a baseline process for assessing commercial property condition. The assignment’s agreed scope and the applicable edition should be identified in the engagement and report.

Standards & guidance

ASTM International

A standards-development organization whose publications include test methods, practices, guides, specifications, and terminology used across construction and real estate due diligence.

Construction

Attic stock

Spare materials retained or furnished for future maintenance and replacement, often matching the installed products.

Existing buildings

Authority having jurisdiction (AHJ)

The organization or official responsible for enforcing a particular code, standard, permit, or approval requirement. More than one authority may be involved in a project.

Construction

Baseline schedule

The agreed reference schedule against which later progress and forecasts are compared.

Sustainability

Basis of design (BOD)

Documentation explaining the design approach, criteria, and assumptions used to meet project requirements.

Existing buildings

Bearing capacity

The ability of soil or rock to support an applied foundation load under defined engineering criteria.

Construction

Beneficial occupancy

Use of all or part of a facility before every construction obligation has been completed.

Construction

Bid leveling

Comparing proposals on a consistent scope and pricing basis to identify differences, exclusions, and assumptions.

Lending & investment

Bridge loan

Interim financing used while an asset or transaction moves toward a later financing or operating condition.

Environmental

Brownfield

Property whose redevelopment or reuse may be complicated by actual or potential contamination, with specific definitions used by different programs.

Sustainability

Building commissioning

A quality-focused process for documenting and verifying that building systems meet the owner’s requirements within the defined project scope. It connects requirements, design, installation, testing, and operations.

Sustainability

Building electrification

Replacing or reducing fuel-based building uses with electrically powered systems. Feasibility depends on the existing building, utility service, equipment, operating needs, and implementation plan.

Existing buildings

Building envelope

The assemblies separating a building’s interior from the exterior environment, including roofs, walls, windows, doors, and their interfaces. Performance depends on how these parts work together.

Construction

Building permit

Authorization from the applicable authority to perform specified building work, subject to its conditions and approved documents.

Existing buildings

Building systems

The interconnected structural, enclosure, mechanical, electrical, plumbing, fire-protection, and other assemblies that allow a property to function. Their condition and interfaces shape renewal needs.

Environmental

Business environmental risk (BER)

An environmental concern that can affect a business or transaction even when it is outside a particular assessment’s defined core scope.

Existing buildings

Capital expenditure

Spending for a significant asset improvement, renewal, or replacement, as distinguished for planning purposes from routine operating maintenance. Accounting and tax treatment require separate professional judgment.

Lending & investment

Capital stack

The layers of debt and equity funding a real estate investment, with different payment priorities, economics, and rights.

Lending & investment

Carrying costs

Costs incurred to hold and support a property or project over time, such as interest, insurance, taxes, and certain operating expenses.

Construction

Certificate of occupancy

A document issued by the authority having jurisdiction concerning a building’s approved occupancy or use. The name, requirements, and treatment of temporary certificates vary by jurisdiction.

Environmental

Chain of custody

Documentation tracking sample identification, handling, and transfer from collection through laboratory receipt and analysis.

Existing buildings

Change of occupancy

A change in a building’s use or occupancy classification that may trigger additional requirements under the applicable code.

Construction

Change order

A documented modification to the construction contract that adjusts scope, price, time, or another agreed term. Approval status is essential to understanding its effect on the project.

Accessibility

Clear floor space

Unobstructed space provided for a person using a mobility device to approach and use an element. Its size, position, and permitted overlap depend on the applicable standard and use.

Accessibility

Clear width

The unobstructed usable width of a passage or opening measured under the applicable criteria.

Construction

Closeout documents

Records delivered at the end of an assignment to document the work and support its operation, maintenance, or contractual acceptance.

Construction

Committed cost

Cost associated with an executed subcontract, purchase order, or other binding project commitment, including applicable approved adjustments.

Lending & investment

Completion guaranty

A contractual undertaking by a guarantor concerning completion of a project, with obligations and remedies defined in its terms.

Environmental

Conceptual site model (CSM)

An organized description of how contamination may originate, move through a site, and reach people or environmental receptors.

Existing buildings

Condensation

The change of water vapor to liquid water when local temperature and moisture conditions permit it.

Construction

Constructability review

Evaluation of whether the proposed design can be built effectively given sequencing, access, coordination, methods, and site constraints.

Construction

Construction change directive

A contract mechanism directing a change before all adjustments to price or time have been agreed, where the contract provides for it.

Construction

Construction contingency

A budget allowance reserved for defined uncertainties or unforeseen construction costs. Its intended use and approval process depend on the project’s financing and contract documents.

Construction

Construction documents

The drawings, specifications, and other documents defining the construction requirements for an assignment.

Construction

Construction management at risk (CMAR)

A delivery approach in which the construction manager provides preconstruction services and assumes construction responsibilities under the agreement, often with a guaranteed maximum price.

Construction

Construction warranty

A contractual or product-specific undertaking concerning the quality or performance of work, with defined obligations and limitations.

Environmental

Contaminant plume

A distribution of contamination in an environmental medium, such as groundwater, extending from one or more sources.

Environmental

Contaminants of concern (COCs)

Substances selected for evaluation because site history, prior findings, or the investigation’s objectives indicate they may be relevant. The list depends on the property and question being investigated.

Construction

Contract administration

Management of the notices, records, reviews, and decisions needed to administer a construction agreement.

Construction

Contract sum

The agreed compensation for the contracted work, as adjusted under the governing agreement.

Construction

Contract time

The period or completion requirements established by the construction agreement, including properly authorized adjustments.

Construction

Cost to complete

An estimate of the remaining cost to finish a project as of a stated date. It should explain the scope, commitments, assumptions, and unresolved exposures included in the estimate.

Construction

Cost-plus contract

A pricing arrangement reimbursing defined costs of the work plus an agreed fee, with or without a maximum price.

Construction

Critical path

The sequence of linked schedule activities that determines the earliest forecast completion of a project under the schedule’s assumptions. A delay on that sequence can delay completion unless the plan changes.

Accessibility

Cross slope

The slope measured perpendicular to the direction of travel. It is distinct from the running slope along the route.

Existing buildings

Curtain wall

An exterior wall system that does not carry the building’s floor or roof gravity loads, typically supported by the structural frame.

Construction

Daily construction report

A dated site record of work activities, workforce, conditions, deliveries, and notable events during a reporting day.

Environmental

De minimis condition

An environmental condition evaluated as minor under the applicable assessment framework rather than automatically classified as a REC. The classification requires professional judgment and supporting context.

Lending & investment

Debt yield

Defined annual property income, commonly NOI, divided by the loan amount. It expresses income relative to debt without directly using an interest rate or amortization schedule.

Lending & investment

Debt-service coverage ratio (DSCR)

A ratio comparing defined property income with required debt service over a stated period. It is used to evaluate the income available to support loan payments.

Existing buildings

Deferred maintenance

Repair or replacement work that has been postponed. Its significance depends on the affected component, the consequence of further delay, and the property’s operating needs.

Sustainability

Demand response

Adjustment of electricity use in response to grid conditions, pricing, or a program signal.

Construction

Demobilization

Removal of temporary construction resources and restoration of affected areas as site operations wind down.

Construction

Design-bid-build (DBB)

Project delivery separating the owner’s design contract from its construction contract, with construction pricing typically sought after development of the bidding documents.

Construction

Design-build

Project delivery in which the owner contracts with one entity for both design and construction of the agreed scope.

Environmental

Desktop environmental review

A limited review of agreed environmental records and information, generally without site reconnaissance unless separately included. The scope is tailored to the decision being supported.

Environmental

Detection limit

A method-dependent level associated with the ability to distinguish an analyte from background or analytical noise.

Environmental

Dewatering

Removal or control of water to permit excavation or other construction work.

Construction

Direct costs

Costs assigned directly to a particular project or work activity, such as trade labor, materials, and equipment.

Reports & due diligence

Document review

Examination of supplied or obtained records against a defined technical purpose.

Existing buildings

Drainage plane

A layer or surface within an enclosure assembly that directs water toward an intended outlet.

Construction

Draw request

A request to release project funds under a construction loan or other funding arrangement. The package typically combines a requested amount with documentation of eligible costs and progress.

Existing buildings

Easement

A defined right to use or control a specified aspect of another party’s property, governed by its creating documents and applicable law.

Sustainability

Embodied carbon

Greenhouse-gas emissions associated with materials and construction across the life-cycle stages included in an assessment.

Existing buildings

Encroachment

A physical feature extending into another property or an area subject to a boundary, easement, or other restriction.

Sustainability

Energy audit

An evaluation of building energy use and opportunities to improve performance within a defined level of analysis.

Sustainability

Energy benchmarking

Measuring building energy use consistently and comparing performance over time or against an appropriate reference. Reliable property and utility data are the foundation.

Sustainability

Energy conservation measure (ECM)

A proposed operational or physical change intended to reduce energy use. Evaluation should connect the measure to its cost, expected savings, implementation requirements, and operating consequences.

Sustainability

Energy use intensity (EUI)

Energy consumption expressed per unit of building area over a stated period. It allows energy use to be discussed alongside building size.

Environmental

Environmental lien

A claim against property associated with environmental response or cleanup costs. Its existence and effect depend on the relevant records and legal framework.

Environmental

Environmental professional (EP)

A person meeting the qualification requirements for the environmental inquiry being performed. For AAI, the federal rule defines the applicable qualification routes.

Environmental

Environmental Transaction Screen

A defined environmental screening process that may combine records, a questionnaire, interviews, and site observations. It is a different scope from a Phase I ESA.

Construction

Equity contribution

Capital contributed to the project by its owners or investment partners rather than advanced as construction-loan proceeds. Its amount, timing, and acceptable evidence are governed by the investment and financing arrangements.

Lending & investment

Equity-first funding

A funding sequence requiring specified equity to be contributed before loan proceeds are advanced.

Construction

Estimated final cost

A forecast of the total cost when a defined scope is complete, combining cost incurred to date with the estimated remaining cost.

Existing buildings

Expected useful life (EUL)

The typical service period anticipated for a type of building component under stated conditions. It provides a starting point for capital planning rather than a fixed replacement deadline.

Environmental

Exposure pathway

The route by which a contaminant can move from a source to a person or other receptor.

Existing buildings

Facility condition index (FCI)

A ratio comparing defined facility deficiency costs with a stated replacement value, used as one indicator of asset condition.

Construction

Fast-track construction

Overlapping design, procurement, and construction so some work starts before all project design is complete.

Construction

Final completion

The point at which the remaining contractual completion obligations have been satisfied under the agreement.

Construction

Final payment

The payment intended to settle the remaining contract balance after the applicable payment conditions have been satisfied.

Existing buildings

Fire-resistance rating

A measure of an assembly’s fire performance established through an applicable test or approved design method.

Existing buildings

Firestopping

Materials and assemblies used to maintain required fire-resistance performance at penetrations or joints in rated construction.

Existing buildings

Flashing

Material arranged at joints, penetrations, and transitions to collect or direct water away from vulnerable construction.

Existing buildings

Floor area ratio (FAR)

The relationship between floor area counted under a zoning rule and the relevant lot area.

Construction

Front-loading

Assigning a disproportionate share of contract value to work billed early in a project. The resulting payments can run ahead of the value of work actually in place.

Sustainability

Functional performance testing

Documented testing of a system’s operation against defined requirements and sequences. It evaluates behavior under specified conditions, not merely whether equipment turns on.

Construction

Funding shortfall

A gap between the funds available for a defined project obligation and the amount expected to be needed to satisfy it. The comparison requires a consistent scope and date.

Construction

Gantt chart

A bar-chart presentation of activities against a timeline, showing their planned or actual duration and timing.

Construction

General conditions costs

Project-level construction management and support costs, such as site supervision, temporary facilities, safety provisions, and site administration. The contract should distinguish these costs from the contractor’s fee.

Existing buildings

Geotechnical report

A report describing subsurface exploration, engineering interpretation, and recommendations for a specified site and proposed work.

Environmental

Groundwater

Water present in saturated subsurface soil or rock.

Construction

Guaranteed maximum price (GMP)

A contract pricing arrangement establishing a maximum payable amount for defined work, subject to the agreement’s adjustments and exclusions.

Construction

Hard costs

Direct costs of physical construction, such as labor, materials, installed equipment, and site improvements. The precise boundary depends on the project’s budget conventions.

Sustainability

Heat pump

Equipment that transfers heat between sources and spaces rather than producing all useful heat through combustion or electrical resistance.

Existing buildings

Immediate repairs

Deficiencies identified for prompt attention under the assessment’s scope or applicable lender/program requirements. Classification depends on the nature of the condition and the reporting framework.

Construction

Indirect costs

Costs supporting work that are allocated rather than traced exclusively to a single production activity.

Reports & due diligence

Initial site visit (ISV)

An early observation establishing documented site or project conditions at the beginning of an assignment.

Environmental

Institutional control

An administrative or legal measure limiting land or resource use to help manage exposure to residual contamination.

Existing buildings

Insurable replacement value (IRV)

An estimate of the cost to replace the property improvements considered in a stated insurance scope. It is distinct from market value, land value, and outstanding loan balance.

Construction

Integrated project delivery (IPD)

A collaborative delivery approach aligning key participants early, with responsibilities and any shared commercial incentives established by agreement.

Reports & due diligence

Intended user

A party identified as an authorized user of a report for its stated purpose and under the engagement’s terms.

Lending & investment

Interest reserve

A budgeted amount intended to cover loan interest during a defined period, often while a project is under construction and not generating sufficient income.

Accessibility

Knee and toe clearance

Unobstructed space beneath certain elements that permits an accessible approach where required.

Environmental

Lead risk assessment

An evaluation of lead hazards, potentially involving paint, dust, or soil, under the applicable assessment requirements.

Environmental

Lead-based paint inspection

An examination intended to identify the presence and location of lead-based paint using the applicable procedures.

Lending & investment

Lease-up

The period or process of bringing a property’s available space into occupancy under leases.

Existing buildings

Legal nonconforming use

A use that may lawfully continue despite not meeting current zoning requirements, subject to jurisdiction-specific rules and evidence.

Construction

Lien waiver

A document through which a party waives specified rights to assert a construction lien, often in connection with payment. The effect depends on its language and applicable law.

Construction

Liquidated damages

A contractually stated amount or method for calculating damages for a specified breach, often delayed completion, subject to applicable law.

Existing buildings

Load path

The connected sequence of structural elements carrying forces through a building to its foundations and supporting ground.

Existing buildings

Load-bearing wall

A wall that carries structural loads in addition to its own weight, transferring them to supporting elements below.

Lending & investment

Loan in balance

A financing concept comparing remaining available funding with the amount required to complete the project under the loan’s defined test.

Lending & investment

Loan-to-cost ratio (LTC)

The loan amount divided by the project cost recognized for the financing. It measures leverage against cost rather than against appraised value.

Lending & investment

Loan-to-value ratio (LTV)

The loan amount expressed as a percentage of the property value used for underwriting. The valuation may describe the property as it exists, upon completion, or at stabilization.

NYC Local Laws

Local Law 84 of 2009 (NYC benchmarking)

New York City’s annual energy and water benchmarking requirement for applicable buildings. The current covered-building requirements and reporting instructions determine the owner’s obligations.

NYC Local Laws

Local Law 87 of 2009 (NYC audits and RCx)

New York City’s periodic energy-audit and retro-commissioning requirement for applicable buildings. The current rules establish covered properties, filing cycles, and required documentation.

NYC Local Laws

Local Law 97 of 2019 (NYC building emissions)

New York City’s building-emissions requirements for applicable properties. Compliance planning connects the property’s reporting obligations with its energy use, systems, and capital plan.

Construction

Long-lead item

Material or equipment requiring substantial time for design, approvals, manufacture, delivery, or installation. Its procurement can influence the project’s completion date.

Construction

Look-ahead schedule

A near-term work plan translating the overall schedule into activities and constraints for the coming weeks.

Construction

Lump-sum contract

A contract with an agreed price for a defined scope of work, subject to authorized adjustments.

Accessibility

Maneuvering clearance

Space needed to approach, open, and pass through a door or other element as defined by the applicable accessibility requirements.

Construction

MasterFormat

CSI and CSC’s classification system for organizing construction specifications and related information by work results.

Existing buildings

Means of egress

The system of travel components providing a route from an occupied area toward a safe exit destination under the applicable code.

Construction

Milestone schedule

A schedule highlighting significant project events or completion points rather than every detailed work activity.

Construction

Mobilization

The work and resources needed to establish construction operations, such as moving equipment, setting up temporary facilities, and preparing site logistics.

Construction

Multiple prime contracts

An arrangement in which the owner contracts directly with more than one contractor for different portions of the work.

Lending & investment

Net operating income (NOI)

Property operating income after the operating expenses included in a stated calculation, generally before debt service and income taxes.

Construction

Nonconforming work

Work that does not meet an applicable contract requirement, approved detail, or specified criterion.

Construction

Notice of award

Notification that a bidder or proposer has been selected for a contract.

Accessibility

Operable parts

The portions of an element that a person uses to activate, adjust, open, or control it.

Sustainability

Operational carbon

Greenhouse-gas emissions associated with operating a building, including energy use under a stated accounting boundary.

Environmental

Operations and maintenance plan

A property-specific document describing how identified materials, systems, or conditions will be managed during ongoing use. An environmental O&M plan sets out relevant controls, responsibilities, records, and response procedures.

Existing buildings

Opinion of probable cost

A professional estimate of likely cost for a defined repair or scope based on the information available and stated assumptions.

Construction

Overhead and profit (O&P)

An allowance or markup for business overhead and profit, calculated as specified in a proposal or contract.

Construction

Owner-direct work

Project work or procurement contracted directly by the owner outside the general contractor’s agreement. It may still be essential to completing and operating the project.

Lending & investment

Pari passu funding

A construction funding arrangement in which specified capital sources contribute alongside one another in agreed proportions.

Construction

Payment application

A contractor’s request for payment supported by a statement of work performed, materials, and other amounts claimed under the contract.

Construction

Payment bond

A surety bond addressing payment obligations to specified parties furnishing labor or materials, subject to the bond and applicable law.

Sustainability

Peak demand

The highest rate of energy use over a defined measurement interval or billing period, commonly expressed as electrical power.

Construction

Pending change order

A proposed or unresolved change whose price, time effect, or authorization is not yet finalized.

Construction

Percent complete

An expression of progress against a defined scope or value basis at a stated date.

Construction

Performance bond

A surety bond addressing specified contractor performance obligations under its terms.

Environmental

Phase II environmental site assessment

A targeted investigation that may include sampling and laboratory analysis to evaluate suspected environmental impacts. The investigation design follows the questions raised by the available evidence.

Construction

Phased construction

Delivery of work in defined stages, with separate scopes, sequences, or turnover milestones.

Existing buildings

Physical deficiency

A condition affecting a building component or system that warrants repair, replacement, or further evaluation within the assessment scope.

Reports & due diligence

Plan and cost review

A pre-construction review of project information and budget to identify scope, cost, coordination, and completion considerations for the intended user.

Existing buildings

Ponding water

Water that remains accumulated on a surface rather than draining as intended.

Lending & investment

Preferred equity

An ownership investment with negotiated preferences, often concerning distributions or return of capital, ahead of common equity.

Construction

Prime contract

An agreement directly between the owner and a contractor for specified project work.

Existing buildings

Probable maximum loss (PML)

A term used in property-risk discussions for an estimated loss under a defined hazard scenario. In seismic reports, the precise metric and modeling assumptions must be stated.

Construction

Procurement log

A record tracking the ordering, fabrication, delivery, and related milestones for project materials and equipment.

Construction

Project budget

The planned funding allocation for a defined development or project, including the cost categories selected by the owner or financing parties.

Reports & due diligence

Property resilience assessment

An evaluation of how a property is exposed and potentially vulnerable to defined hazards and how it may maintain or recover function.

Accessibility

Protruding object

An object extending into a circulation path in a way that may require limits or protection under accessibility criteria.

Construction

Punch list

A record of incomplete, deficient, or corrective work identified near project completion. Items normally require assignment, correction, and follow-up verification.

Construction

Purchase order

A document used to order defined goods or services with specified commercial terms.

Construction

Quality assurance (QA)

Planned procedures for establishing confidence that quality requirements and quality-control processes are being followed.

Construction

Quality control (QC)

Checks and corrective actions used to determine whether materials and work meet the specified requirements.

Construction

Quantity takeoff

Measurement of work quantities from project information for estimating, procurement, or cost review.

Sustainability

R-value

A measure of resistance to heat flow through a material or assembly under stated conditions.

Accessibility

Ramp landing

A relatively level area associated with a ramp run that supports stopping, maneuvering, or changing direction.

Accessibility

Reach range

The vertical and horizontal extent within which an operable element must be located for accessible use under the applicable criteria.

Environmental

Recognized environmental condition (REC)

A classification under the applicable ASTM Phase I ESA practice for certain conditions involving the presence, likely presence, or material threat of release of hazardous substances or petroleum products.

Construction

Record drawings

Drawings documenting the completed work based on the information and verification process specified for their preparation.

Construction

Recovery schedule

A proposed plan for regaining lost time or meeting a required milestone after delay.

Reports & due diligence

Reliance letter

A document addressing whether a specified party may rely on a report, subject to its stated terms and the underlying engagement.

Existing buildings

Remaining useful life (RUL)

An estimate of how long an existing component may continue to perform before major repair or replacement. It considers observed condition and relevant operating history, not age alone.

Environmental

Remediation

Actions taken to address contamination or reduce associated risks under a defined cleanup approach.

Existing buildings

Replacement reserves

Funds planned or held for future replacement of building systems and components. A reserve schedule connects anticipated work with timing and estimated cost.

Reports & due diligence

Report addendum

A supplemental document that clarifies or updates a defined portion of an existing report.

Environmental

Reporting limit

The laboratory threshold used to report quantified analytical results under a stated method and reporting convention.

Construction

Retainage

A portion of earned payment withheld under the construction contract until specified release conditions are met. The applicable percentage and release process come from the contract and governing requirements.

Sustainability

Retro-commissioning (RCx)

A commissioning process applied to an existing building to investigate and improve how its systems operate. It focuses on actual operation and the owner’s current requirements.

Existing buildings

Roof membrane

The water-resisting layer in a roofing assembly, with performance dependent on the complete installed system.

Accessibility

Running slope

The slope measured in the direction of travel along a route or ramp.

Environmental

Sampling plan

A defined approach to collecting samples that addresses an investigation’s questions, locations, media, methods, and quality requirements.

Construction

Schedule float

The scheduling flexibility available to an activity before a specified milestone or project completion is affected, depending on the float measure used.

Construction

Schedule logic

The dependencies connecting activities in a project schedule, including predecessor and successor relationships.

Construction

Schedule of values

A breakdown of the construction contract amount into work items used to organize progress billing. Each line has an assigned value against which completed work and stored materials are reported.

Construction

Scope gap

Work necessary to deliver the intended project that is missing, unclear, or inconsistently allocated among contracts, drawings, specifications, and budgets.

Construction

Scope of work (SOW)

The work, deliverables, boundaries, and responsibilities assigned under a project agreement.

Existing buildings

Seismic risk assessment

An evaluation of potential building performance and loss under specified earthquake assumptions. The scope may consider the structure, site conditions, and the earthquake scenario used in the analysis.

Lending & investment

Senior debt

Debt with priority over specified junior capital under the applicable loan, security, and intercreditor arrangements.

Sustainability

Sequence of operations

A written description of how equipment and controls are intended to respond under different operating conditions.

Existing buildings

Setback

A required separation between specified development features and a property line or other reference under the applicable land-use rules.

Existing buildings

Settlement

Downward movement of a foundation or supporting ground. Differential settlement means different portions move by different amounts.

Construction

Shop drawings

Detailed drawings prepared to explain fabrication, assembly, or installation of a particular portion of the work.

Environmental

Significant data gap

Missing information that materially affects the environmental professional’s ability to identify relevant environmental conditions under the assessment framework.

Sustainability

Site energy

Energy consumed at a property as measured at its delivery boundary, commonly using utility bills and on-site fuel records.

Construction

Soft costs

Project costs outside direct physical construction, commonly including design, legal, financing, permitting, insurance, and consulting expenses. Budget definitions should be stated explicitly.

Environmental

Soil gas

Gas occupying pore spaces in soil, which can be sampled to evaluate certain subsurface conditions.

Sustainability

Source energy

An energy measure that includes energy used upstream to produce and deliver the energy consumed at a building.

Lending & investment

Sources and uses

A financing summary matching the capital expected to fund a project with the expenditures that capital is intended to cover.

Existing buildings

Special inspections

Code-required inspections or tests of specified work by qualified parties under the applicable jurisdiction’s rules.

Existing buildings

Specialist investigation

A focused technical review used when a general assessment identifies a condition requiring deeper analysis, testing, or discipline-specific expertise. Its scope should address a defined question.

Construction

Specifications

Written requirements describing materials, performance, execution, and other criteria for the work.

Lending & investment

Stabilization

A defined stage at which a property is considered to have reached a sustainable operating level, often measured by occupancy and income criteria.

Construction

Stored materials

Project materials purchased but not yet permanently installed. They may be stored on site or at another location, subject to the project’s payment and financing conditions.

Existing buildings

Structural assessment

A focused evaluation of structural conditions or performance for a defined purpose.

Construction

Subcontract

An agreement under which a contractor engages another party to perform an identified portion of its work.

Construction

Submittal

Product data, shop drawings, samples, or other information submitted for review under the construction documents.

Lending & investment

Subordinate debt

Debt whose payment or enforcement rights rank behind another obligation under the governing arrangements.

Construction

Substantial completion

A contract-defined stage at which the work is sufficiently complete for its intended use or occupancy, subject to the governing contract and required certifications. It is not necessarily final completion.

Construction

Substitution

A proposed replacement for a specified product, system, or method.

Construction

Supplementary conditions

Project-specific provisions that add to or modify the general conditions of a construction contract.

Construction

System startup

Initial activation and checkout of installed equipment or systems before regular operation.

Lending & investment

Takeout financing

Financing intended to replace an earlier loan, commonly permanent financing replacing a construction or bridge loan.

Existing buildings

Tenant improvements (TI)

Work adapting leased space for a tenant’s use, ranging from finishes to substantial building-system changes.

Existing buildings

Thermal bridge

A location where heat flows more readily through an assembly because of a conductive material or a break in insulation continuity.

Construction

Time and materials (T&M)

A payment arrangement based on documented labor time, materials, and other agreed charges rather than solely a fixed total.

Sustainability

TR-8 energy-code progress inspection

A New York City filing and sign-off framework for required energy-code progress inspections. Applicable inspection categories and responsibilities depend on the approved project filing.

Construction

Transmittal

A record identifying documents, samples, or other items sent from one project participant to another.

Accessibility

Turning space

Clear space allowing a wheelchair user to change direction under the applicable accessibility criteria.

Sustainability

U-factor

A measure of heat transfer through a material or assembly; lower values indicate less heat transfer for the same basis.

Environmental

Underground storage tank (UST)

A tank system located wholly or partly below ground, often used to store petroleum or other substances. Regulatory definitions determine which systems are covered.

Construction

Unit-price contract

A contract pricing work by an agreed rate per measured unit rather than solely by one fixed total.

Existing buildings

Useful-life assumptions

The life-cycle inputs used to forecast when building components may need repair or replacement. They link a current condition assessment to an anticipated capital schedule.

Construction

Value engineering

Evaluation of alternatives intended to improve value while maintaining required functions and performance.

Environmental

Vapor encroachment condition (VEC)

A condition involving the presence or likely presence of contaminant vapors in the subsurface of a property due to a release from contaminated soil or groundwater.

Environmental

Vapor intrusion

Movement of vapors from a subsurface source into an overlying or nearby building.

Existing buildings

Vapor retarder

A material or layer that limits water-vapor diffusion through an assembly.

Construction

Variance

A difference between a planned or reported value and a comparison value, such as actual cost, observed progress, or the current schedule forecast. The term needs a stated basis.

Existing buildings

Walk-through survey

A visual observation of accessible property areas and systems within a defined assessment scope.

Existing buildings

Water intrusion

Unintended entry or movement of water into a building assembly or occupied space. It may arise from the exterior, plumbing, groundwater, or other sources.

Existing buildings

Waterproofing

A system intended to resist water penetration under the exposure conditions for which it is designed.

Sustainability

Weather normalization

Adjustment of energy results to account for weather differences when comparing periods or conditions.

Construction

Work in place

Construction that has been installed or performed at the project, distinguished from materials merely procured or stored.

Existing buildings

Zoning due diligence

Review of a property’s use and development characteristics against the applicable land-use framework and available records.

Reports & due diligence

Zoning report

A report organizing applicable land-use information, property characteristics, and identified conformance questions for a specified transaction or purpose.

Put the terms to work

Looking for the actual records?

Find government permit, inspection, zoning, property, and environmental resources by location.

Open the Public Records Resource Finder →

NYC Local Laws

The law, the year, and the building context.

Select NYC Local Laws in the directory to explore inspections, construction safety, energy, housing, and code changes. This is a curated building-focused reference—not an exhaustive legal register or a substitute for a property-specific compliance review. NYC laws are distinct from New York State requirements. Each entry links to City sources and includes a practical example.

Looking for a report or service?

Start with the scope.

These report names link directly to the corresponding service, including its purpose and deliverables.

Construction progress monitoring / draw inspection

Field observations and document review supporting construction funding decisions.

Explore the service →

Phase I Environmental Site Assessment

Environmental due diligence combining records, property history, site reconnaissance, and interviews within the agreed assessment scope.

Explore the service →

Property Condition Assessment (PCA)

Review of a property’s major systems, visible deficiencies, and anticipated capital needs.

Explore the service →

Fannie Mae PCA / Physical Needs Assessment

Property condition and capital-needs review under the applicable Fannie Mae program and lender requirements.

Explore the service →

Freddie Mac PCA / Property Condition Report

Property condition and capital-needs review under the applicable Freddie Mac program and lender requirements.

Explore the service →

Housing Rehabilitation Determination (HRD/HRDR)

A program-specific environmental determination supporting certain housing rehabilitation and public-financing processes.