Aboveground storage tank (AST)
A tank located above ground, with associated piping and containment that may be relevant to environmental due diligence.
KOW reference library
From the first budget review to the next capital plan: clear definitions, practical examples, and the distinctions that matter in a project report.
Field reference
General educational guidance—not a substitute for the contract, governing standard, lender requirements, or a project-specific assessment.
A tank located above ground, with associated piping and containment that may be relevant to environmental due diligence.
A review of design documents against the accessibility criteria included in an agreed scope. It identifies coordination issues and potential barriers before they are built.
The provisions determining which spaces, elements, and quantities must meet specified accessibility requirements.
A connected route meeting the applicable accessibility requirements between the spaces and elements it serves. Compliance depends on the complete route, not just an isolated ramp or doorway.
A restriction or limitation associated with property use or activity that helps manage environmental risk.
Conversion of an existing building to a new use while retaining some or much of its existing structure.
A formal supplement or revision to bidding or procurement documents, typically issued before the contract is executed.
The percentage of an eligible cost or value that a financing arrangement allows to be funded.
A payment-application and certification form commonly used to summarize a contractor’s current request for payment. It presents contract adjustments, earned amounts, retainage, prior payments, and the balance requested.
The continuation sheet commonly paired with an AIA G702. It shows the schedule of values, work completed, stored materials, and remaining balance by line item.
A connected system of materials and joints controlling unintended airflow through the building enclosure.
The federal environmental inquiry process relevant to certain CERCLA liability protections when acquiring property. A qualifying assessment is one part of a larger set of requirements.
An amount included in a contract or budget for a defined scope whose final selection, quantity, or cost has not yet been established. It is tied to an identified item rather than general uncertainty.
A change to an existing building or facility that may trigger accessibility requirements under the governing rules. Its treatment depends on the nature and scope of the work.
A separately priced addition, deduction, or substitution to the base scope offered during bidding.
An architect’s written record of a site visit, observations, and items requiring follow-up under the agreed construction-phase services.
Written architectural clarifications or instructions for minor changes that do not adjust the contract sum or contract time under the applicable contract procedure.
A valuation premise describing a property with specified construction or improvements assumed complete.
Material containing asbestos as defined by the applicable regulatory or analytical framework. Appearance alone does not reliably establish whether a material contains asbestos.
A standard addressing procedures and reporting for commercial building energy audits, including differing levels of analysis.
A standard addressing ventilation and related measures for acceptable indoor air quality in buildings within its scope.
An energy-efficiency standard widely used as a basis or compliance path for commercial building energy requirements.
The boundaries and constraints affecting an assessment, including agreed exclusions, inaccessible areas, missing records, and the nature of the methods used.
An ASTM test method for evaluating water penetration of installed windows, skylights, doors, and curtain walls under specified pressure conditions.
An ASTM practice for Phase I environmental site assessments of commercial real estate, focused on identifying recognized environmental conditions.
An ASTM practice describing a limited environmental due-diligence transaction-screen process.
An ASTM practice providing a framework for Phase II environmental site assessment, including investigation of potential contamination.
An ASTM guide describing a baseline process for assessing commercial property condition. The assignment’s agreed scope and the applicable edition should be identified in the engagement and report.
An ASTM guide addressing seismic risk assessment of buildings.
An ASTM practice addressing Phase I environmental site assessment of forestland or rural property.
An ASTM practice for probable maximum loss evaluations used in earthquake due diligence.
An ASTM guide for screening vapor encroachment concerns at property involved in a real estate transaction.
An ASTM practice addressing the commissioning process for building enclosures.
An ASTM guide supporting the building enclosure commissioning process.
An ASTM guide addressing property resilience assessments in relation to natural hazards.
A standards-development organization whose publications include test methods, practices, guides, specifications, and terminology used across construction and real estate due diligence.
Spare materials retained or furnished for future maintenance and replacement, often matching the installed products.
The organization or official responsible for enforcing a particular code, standard, permit, or approval requirement. More than one authority may be involved in a project.
The agreed reference schedule against which later progress and forecasts are compared.
Documentation explaining the design approach, criteria, and assumptions used to meet project requirements.
The ability of soil or rock to support an applied foundation load under defined engineering criteria.
Use of all or part of a facility before every construction obligation has been completed.
Comparing proposals on a consistent scope and pricing basis to identify differences, exclusions, and assumptions.
Interim financing used while an asset or transaction moves toward a later financing or operating condition.
Property whose redevelopment or reuse may be complicated by actual or potential contamination, with specific definitions used by different programs.
A system that monitors or controls building equipment through sensors, controllers, communications, and operating logic.
A quality-focused process for documenting and verifying that building systems meet the owner’s requirements within the defined project scope. It connects requirements, design, installation, testing, and operations.
Replacing or reducing fuel-based building uses with electrically powered systems. Feasibility depends on the existing building, utility service, equipment, operating needs, and implementation plan.
The assemblies separating a building’s interior from the exterior environment, including roofs, walls, windows, doors, and their interfaces. Performance depends on how these parts work together.
A process using coordinated digital building information to support design, construction, and potentially facility operations.
Authorization from the applicable authority to perform specified building work, subject to its conditions and approved documents.
The interconnected structural, enclosure, mechanical, electrical, plumbing, fire-protection, and other assemblies that allow a property to function. Their condition and interfaces shape renewal needs.
An environmental concern that can affect a business or transaction even when it is outside a particular assessment’s defined core scope.
Spending for a significant asset improvement, renewal, or replacement, as distinguished for planning purposes from routine operating maintenance. Accounting and tax treatment require separate professional judgment.
An assessment of physical conditions and anticipated repair or replacement needs over a defined planning period.
The layers of debt and equity funding a real estate investment, with different payment priorities, economics, and rights.
Costs incurred to hold and support a property or project over time, such as interest, insurance, taxes, and certain operating expenses.
A document issued by the authority having jurisdiction concerning a building’s approved occupancy or use. The name, requirements, and treatment of temporary certificates vary by jurisdiction.
Documentation tracking sample identification, handling, and transfer from collection through laboratory receipt and analysis.
A change in a building’s use or occupancy classification that may trigger additional requirements under the applicable code.
A documented modification to the construction contract that adjusts scope, price, time, or another agreed term. Approval status is essential to understanding its effect on the project.
Unobstructed space provided for a person using a mobility device to approach and use an element. Its size, position, and permitted overlap depend on the applicable standard and use.
The unobstructed usable width of a passage or opening measured under the applicable criteria.
Records delivered at the end of an assignment to document the work and support its operation, maintenance, or contractual acceptance.
The ratio of useful heating or cooling output to the energy input for a stated operating condition.
Cost associated with an executed subcontract, purchase order, or other binding project commitment, including applicable approved adjustments.
A contractual undertaking by a guarantor concerning completion of a project, with obligations and remedies defined in its terms.
An organized description of how contamination may originate, move through a site, and reach people or environmental receptors.
The change of water vapor to liquid water when local temperature and moisture conditions permit it.
Requirements that must be satisfied before an advance or other contractual obligation becomes due.
Evaluation of whether the proposed design can be built effectively given sequencing, access, coordination, methods, and site constraints.
A contract mechanism directing a change before all adjustments to price or time have been agreed, where the contract provides for it.
A budget allowance reserved for defined uncertainties or unforeseen construction costs. Its intended use and approval process depend on the project’s financing and contract documents.
The drawings, specifications, and other documents defining the construction requirements for an assignment.
The agreement setting the terms under which a lender commits and advances funds for construction.
A delivery approach in which the construction manager provides preconstruction services and assumes construction responsibilities under the agreement, often with a guaranteed maximum price.
A dated report documenting construction status and review of a funding request within the consultant’s scope.
A contractual or product-specific undertaking concerning the quality or performance of work, with defined obligations and limitations.
A distribution of contamination in an environmental medium, such as groundwater, extending from one or more sources.
Substances selected for evaluation because site history, prior findings, or the investigation’s objectives indicate they may be relevant. The list depends on the property and question being investigated.
Management of the notices, records, reviews, and decisions needed to administer a construction agreement.
The agreed compensation for the contracted work, as adjusted under the governing agreement.
The period or completion requirements established by the construction agreement, including properly authorized adjustments.
An ASTM Phase I ESA classification concerning a qualifying release that has been addressed with contamination allowed to remain subject to required controls or restrictions.
An estimate of the remaining cost to finish a project as of a stated date. It should explain the scope, commitments, assumptions, and unresolved exposures included in the estimate.
A pricing arrangement reimbursing defined costs of the work plus an agreed fee, with or without a maximum price.
The sequence of linked schedule activities that determines the earliest forecast completion of a project under the schedule’s assumptions. A delay on that sequence can delay completion unless the plan changes.
The slope measured perpendicular to the direction of travel. It is distinct from the running slope along the route.
An exterior wall system that does not carry the building’s floor or roof gravity loads, typically supported by the structural frame.
A dated site record of work activities, workforce, conditions, deliveries, and notable events during a reporting day.
An environmental condition evaluated as minor under the applicable assessment framework rather than automatically classified as a REC. The classification requires professional judgment and supporting context.
Defined annual property income, commonly NOI, divided by the loan amount. It expresses income relative to debt without directly using an interest rate or amortization schedule.
A ratio comparing defined property income with required debt service over a stated period. It is used to evaluate the income available to support loan payments.
Repair or replacement work that has been postponed. Its significance depends on the affected component, the consequence of further delay, and the property’s operating needs.
Adjustment of electricity use in response to grid conditions, pricing, or a program signal.
Removal of temporary construction resources and restoration of affected areas as site operations wind down.
Project delivery separating the owner’s design contract from its construction contract, with construction pricing typically sought after development of the bidding documents.
Project delivery in which the owner contracts with one entity for both design and construction of the agreed scope.
A limited review of agreed environmental records and information, generally without site reconnaissance unless separately included. The scope is tailored to the decision being supported.
A method-dependent level associated with the ability to distinguish an analyte from background or analytical noise.
Removal or control of water to permit excavation or other construction work.
Costs assigned directly to a particular project or work activity, such as trade labor, materials, and equipment.
Examination of supplied or obtained records against a defined technical purpose.
A layer or surface within an enclosure assembly that directs water toward an intended outlet.
A request to release project funds under a construction loan or other funding arrangement. The package typically combines a requested amount with documentation of eligible costs and progress.
A defined right to use or control a specified aspect of another party’s property, governed by its creating documents and applicable law.
Greenhouse-gas emissions associated with materials and construction across the life-cycle stages included in an assessment.
A physical feature extending into another property or an area subject to a boundary, easement, or other restriction.
An evaluation of building energy use and opportunities to improve performance within a defined level of analysis.
Measuring building energy use consistently and comparing performance over time or against an appropriate reference. Reliable property and utility data are the foundation.
A proposed operational or physical change intended to reduce energy use. Evaluation should connect the measure to its cost, expected savings, implementation requirements, and operating consequences.
Energy consumption expressed per unit of building area over a stated period. It allows energy use to be discussed alongside building size.
A physical measure designed to contain contamination or reduce exposure, such as a cap or a vapor-control system.
A claim against property associated with environmental response or cleanup costs. Its existence and effect depend on the relevant records and legal framework.
A person meeting the qualification requirements for the environmental inquiry being performed. For AAI, the federal rule defines the applicable qualification routes.
A defined environmental screening process that may combine records, a questionnaire, interviews, and site observations. It is a different scope from a Phase I ESA.
Capital contributed to the project by its owners or investment partners rather than advanced as construction-loan proceeds. Its amount, timing, and acceptable evidence are governed by the investment and financing arrangements.
A funding sequence requiring specified equity to be contributed before loan proceeds are advanced.
A forecast of the total cost when a defined scope is complete, combining cost incurred to date with the estimated remaining cost.
The typical service period anticipated for a type of building component under stated conditions. It provides a starting point for capital planning rather than a fixed replacement deadline.
The route by which a contaminant can move from a source to a person or other receptor.
A ratio comparing defined facility deficiency costs with a stated replacement value, used as one indicator of asset condition.
Overlapping design, procurement, and construction so some work starts before all project design is complete.
The point at which the remaining contractual completion obligations have been satisfied under the agreement.
The payment intended to settle the remaining contract balance after the applicable payment conditions have been satisfied.
A measure of an assembly’s fire performance established through an applicable test or approved design method.
Materials and assemblies used to maintain required fire-resistance performance at penetrations or joints in rated construction.
Material arranged at joints, penetrations, and transitions to collect or direct water away from vulnerable construction.
The relationship between floor area counted under a zoning rule and the relevant lot area.
Assigning a disproportionate share of contract value to work billed early in a project. The resulting payments can run ahead of the value of work actually in place.
Documented testing of a system’s operation against defined requirements and sequences. It evaluates behavior under specified conditions, not merely whether equipment turns on.
A gap between the funds available for a defined project obligation and the amount expected to be needed to satisfy it. The comparison requires a consistent scope and date.
A project budget or procurement grouping for furnishing and equipping a facility, with boundaries defined for that project.
A bar-chart presentation of activities against a timeline, showing their planned or actual duration and timing.
Project-level construction management and support costs, such as site supervision, temporary facilities, safety provisions, and site administration. The contract should distinguish these costs from the contractor’s fee.
A report describing subsurface exploration, engineering interpretation, and recommendations for a specified site and proposed work.
A measure of a building’s total floor area under a specified measurement convention.
Water present in saturated subsurface soil or rock.
A contract pricing arrangement establishing a maximum payable amount for defined work, subject to the agreement’s adjustments and exclusions.
Direct costs of physical construction, such as labor, materials, installed equipment, and site improvements. The precise boundary depends on the project’s budget conventions.
Equipment that transfers heat between sources and spaces rather than producing all useful heat through combustion or electrical resistance.
An ASTM Phase I ESA classification for a qualifying past release that has been addressed to the relevant unrestricted-use criteria, as evaluated under the applicable practice.
Deficiencies identified for prompt attention under the assessment’s scope or applicable lender/program requirements. Classification depends on the nature of the condition and the reporting framework.
Costs supporting work that are allocated rather than traced exclusively to a single production activity.
An early observation establishing documented site or project conditions at the beginning of an assignment.
An administrative or legal measure limiting land or resource use to help manage exposure to residual contamination.
An estimate of the cost to replace the property improvements considered in a stated insurance scope. It is distinct from market value, land value, and outstanding loan balance.
An assessment combining building condition and capital needs with energy, water, and performance considerations under the applicable program requirements.
A collaborative delivery approach aligning key participants early, with responsibilities and any shared commercial incentives established by agreement.
A party identified as an authorized user of a report for its stated purpose and under the engagement’s terms.
A budgeted amount intended to cover loan interest during a defined period, often while a project is under construction and not generating sufficient income.
Unobstructed space beneath certain elements that permits an accessible approach where required.
An evaluation of lead hazards, potentially involving paint, dust, or soil, under the applicable assessment requirements.
An examination intended to identify the presence and location of lead-based paint using the applicable procedures.
The period or process of bringing a property’s available space into occupancy under leases.
A use that may lawfully continue despite not meeting current zoning requirements, subject to jurisdiction-specific rules and evidence.
A document through which a party waives specified rights to assert a construction lien, often in connection with payment. The effect depends on its language and applicable law.
Comparison of alternatives using costs over a defined period, rather than initial purchase or construction cost alone.
A contractually stated amount or method for calculating damages for a specified breach, often delayed completion, subject to applicable law.
The connected sequence of structural elements carrying forces through a building to its foundations and supporting ground.
A wall that carries structural loads in addition to its own weight, transferring them to supporting elements below.
A financing concept comparing remaining available funding with the amount required to complete the project under the loan’s defined test.
The loan amount divided by the project cost recognized for the financing. It measures leverage against cost rather than against appraised value.
The loan amount expressed as a percentage of the property value used for underwriting. The valuation may describe the property as it exists, upon completion, or at stabilization.
Establishes NYC’s residential lead-based paint hazard prevention framework, including owner responsibilities for covered housing.
Amends the timing framework for required natural-gas detectors in NYC buildings.
Establishes expanded exterior-wall inspection requirements associated with NYC’s Façade Inspection and Safety Program for buildings greater than six stories.
A broad NYC construction-code update that also established requirements associated with parapet observations and periodic parking-structure condition assessments.
Establishes a NYC pilot framework for converting certain existing basement or cellar apartments into habitable dwelling units.
Adds NYC building and fire-code provisions concerning ancillary dwelling units.
Updates NYC’s electrical-code framework and includes amendments related to electric vehicle supply equipment.
Changes NYC provisions concerning gas-piping inspection scope, ordinary plumbing work, emergency work, and plumbing licensing administration.
Addresses final inspections for temporary construction equipment permits and prohibits stand-off brackets under the amended NYC provisions.
Changes the major-building definition used to determine certain NYC construction site safety supervision requirements.
Amends NYC construction safety provisions concerning cold-formed steel construction.
Amends NYC requirements concerning construction superintendents, including limitations on concurrent primary assignments.
Establishes periodic inspections of covered NYC building gas-piping systems, subject to the applicable exclusions, filing requirements, and inspection schedule.
Restricts onsite combustion of higher-emitting fuels in covered NYC new-building applications through phased requirements and specified exceptions.
Establishes site safety training requirements for workers and supervisors at covered NYC construction sites.
Introduced NYC fire and life-safety changes, including sprinkler and egress-related provisions affecting certain existing office buildings.
Introduced X-ray fluorescence testing requirements for covered NYC residential properties within the City’s lead-paint framework.
Requires covered NYC buildings to display energy efficiency scores and grades derived from annual benchmarking information.
Enacts a dedicated NYC Existing Building Code addressing work such as repairs, alterations, additions, and changes of occupancy in existing buildings.
Coordinates other NYC construction-code provisions with the new Existing Building Code and addresses electrical and elevator inspection provisions.
Amends the statutory framework for exterior-wall inspection intervals and requires a DOB study of façade inspection timing.
Changes NYC requirements for lighting beneath sidewalk sheds.
Adds enforcement provisions addressing failure to complete required façade repairs within the applicable timeframes.
Requires owners of covered NYC housing to address indoor allergen hazards, including mold and pests, and the underlying conditions that support them.
Increases penalties associated with certain DOB violations at parking structures.
Amends the parking-structure assessment framework introduced by Local Law 126 of 2021, including inspection frequency and follow-up for certain condition classifications.
Creates NYC requirements for cooling-tower registration, inspection, testing, cleaning, disinfection, and annual certification.
Establishes construction injury and fatality reporting requirements associated with NYC’s construction safety oversight.
New York City’s annual energy and water benchmarking requirement for applicable buildings. The current covered-building requirements and reporting instructions determine the owner’s obligations.
New York City’s periodic energy-audit and retro-commissioning requirement for applicable buildings. The current rules establish covered properties, filing cycles, and required documentation.
Requires lighting upgrades and electrical submetering for covered NYC buildings and spaces, as amended by subsequent legislation.
Works with Local Law 94 of 2019 to establish NYC sustainable-roof requirements involving solar photovoltaic systems, green roofs, or a combination.
Establishes sustainable roofing zone provisions for covered new construction and roof work, read together with Local Law 92 of 2019.
New York City’s building-emissions requirements for applicable properties. Compliance planning connects the property’s reporting obligations with its energy use, systems, and capital plan.
Material or equipment requiring substantial time for design, approvals, manufacture, delivery, or installation. Its procurement can influence the project’s completion date.
A near-term work plan translating the overall schedule into activities and constraints for the coming weeks.
A contract with an agreed price for a defined scope of work, subject to authorized adjustments.
Space needed to approach, open, and pass through a door or other element as defined by the applicable accessibility requirements.
CSI and CSC’s classification system for organizing construction specifications and related information by work results.
The system of travel components providing a route from an occupied area toward a safe exit destination under the applicable code.
A structured process for evaluating performance or savings against a defined baseline and method.
The building systems associated with environmental conditioning, electrical distribution, and water supply and drainage.
A schedule highlighting significant project events or completion points rather than every detailed work activity.
The work and resources needed to establish construction operations, such as moving equipment, setting up temporary facilities, and preparing site logistics.
An arrangement in which the owner contracts directly with more than one contractor for different portions of the work.
Property operating income after the operating expenses included in a stated calculation, generally before debt service and income taxes.
Work that does not meet an applicable contract requirement, approved detail, or specified criterion.
Notification that a bidder or proposer has been selected for a contract.
A notice authorizing commencement of a defined scope of work under the applicable agreement.
The portions of an element that a person uses to activate, adjust, open, or control it.
Greenhouse-gas emissions associated with operating a building, including energy use under a stated accounting boundary.
A property-specific document describing how identified materials, systems, or conditions will be managed during ongoing use. An environmental O&M plan sets out relevant controls, responsibilities, records, and response procedures.
A professional estimate of likely cost for a defined repair or scope based on the information available and stated assumptions.
An allowance or markup for business overhead and profit, calculated as specified in a proposal or contract.
A coordination meeting among the owner, architect, contractor, and invited participants to review project issues and progress.
Project work or procurement contracted directly by the owner outside the general contractor’s agreement. It may still be essential to completing and operating the project.
A documented statement of the owner’s objectives and functional expectations used to guide design and commissioning.
A construction funding arrangement in which specified capital sources contribute alongside one another in agreed proportions.
A contractor’s request for payment supported by a statement of work performed, materials, and other amounts claimed under the contract.
A surety bond addressing payment obligations to specified parties furnishing labor or materials, subject to the bond and applicable law.
The highest rate of energy use over a defined measurement interval or billing period, commonly expressed as electrical power.
A proposed or unresolved change whose price, time effect, or authorization is not yet finalized.
An expression of progress against a defined scope or value basis at a stated date.
A surety bond addressing specified contractor performance obligations under its terms.
A targeted investigation that may include sampling and laboratory analysis to evaluate suspected environmental impacts. The investigation design follows the questions raised by the available evidence.
Delivery of work in defined stages, with separate scopes, sequences, or turnover milestones.
A condition affecting a building component or system that warrants repair, replacement, or further evaluation within the assessment scope.
A pre-construction review of project information and budget to identify scope, cost, coordination, and completion considerations for the intended user.
Water that remains accumulated on a surface rather than draining as intended.
An ownership investment with negotiated preferences, often concerning distributions or return of capital, ahead of common equity.
An agreement directly between the owner and a contractor for specified project work.
A term used in property-risk discussions for an estimated loss under a defined hazard scenario. In seismic reports, the precise metric and modeling assumptions must be stated.
A record tracking the ordering, fabrication, delivery, and related milestones for project materials and equipment.
The planned funding allocation for a defined development or project, including the cost categories selected by the owner or financing parties.
An evaluation of how a property is exposed and potentially vulnerable to defined hazards and how it may maintain or recover function.
An object extending into a circulation path in a way that may require limits or protection under accessibility criteria.
A record of incomplete, deficient, or corrective work identified near project completion. Items normally require assignment, correction, and follow-up verification.
A document used to order defined goods or services with specified commercial terms.
Planned procedures for establishing confidence that quality requirements and quality-control processes are being followed.
Checks and corrective actions used to determine whether materials and work meet the specified requirements.
Measurement of work quantities from project information for estimating, procurement, or cost review.
A measure of resistance to heat flow through a material or assembly under stated conditions.
A relatively level area associated with a ramp run that supports stopping, maneuvering, or changing direction.
The vertical and horizontal extent within which an operable element must be located for accessible use under the applicable criteria.
A classification under the applicable ASTM Phase I ESA practice for certain conditions involving the presence, likely presence, or material threat of release of hazardous substances or petroleum products.
Drawings documenting the completed work based on the information and verification process specified for their preparation.
A proposed plan for regaining lost time or meeting a required milestone after delay.
A document addressing whether a specified party may rely on a report, subject to its stated terms and the underlying engagement.
An estimate of how long an existing component may continue to perform before major repair or replacement. It considers observed condition and relevant operating history, not age alone.
Actions taken to address contamination or reduce associated risks under a defined cleanup approach.
Funds planned or held for future replacement of building systems and components. A reserve schedule connects anticipated work with timing and estimated cost.
A supplemental document that clarifies or updates a defined portion of an existing report.
The laboratory threshold used to report quantified analytical results under a stated method and reporting convention.
Observation of selected similar units, components, or areas to inform an assessment of a larger group.
A documented request to clarify an uncertainty or conflict in project information.
A portion of earned payment withheld under the construction contract until specified release conditions are met. The applicable percentage and release process come from the contract and governing requirements.
A commissioning process applied to an existing building to investigate and improve how its systems operate. It focuses on actual operation and the owner’s current requirements.
The water-resisting layer in a roofing assembly, with performance dependent on the complete installed system.
The slope measured in the direction of travel along a route or ramp.
A defined approach to collecting samples that addresses an investigation’s questions, locations, media, methods, and quality requirements.
The scheduling flexibility available to an activity before a specified milestone or project completion is affected, depending on the float measure used.
The dependencies connecting activities in a project schedule, including predecessor and successor relationships.
A breakdown of the construction contract amount into work items used to organize progress billing. Each line has an assigned value against which completed work and stored materials are reported.
Work necessary to deliver the intended project that is missing, unclear, or inconsistently allocated among contracts, drawings, specifications, and budgets.
The work, deliverables, boundaries, and responsibilities assigned under a project agreement.
An evaluation of potential building performance and loss under specified earthquake assumptions. The scope may consider the structure, site conditions, and the earthquake scenario used in the analysis.
Debt with priority over specified junior capital under the applicable loan, security, and intercreditor arrangements.
A written description of how equipment and controls are intended to respond under different operating conditions.
A required separation between specified development features and a property line or other reference under the applicable land-use rules.
Downward movement of a foundation or supporting ground. Differential settlement means different portions move by different amounts.
Detailed drawings prepared to explain fabrication, assembly, or installation of a particular portion of the work.
Missing information that materially affects the environmental professional’s ability to identify relevant environmental conditions under the assessment framework.
Energy consumed at a property as measured at its delivery boundary, commonly using utility bills and on-site fuel records.
Project costs outside direct physical construction, commonly including design, legal, financing, permitting, insurance, and consulting expenses. Budget definitions should be stated explicitly.
Gas occupying pore spaces in soil, which can be sampled to evaluate certain subsurface conditions.
The fraction of incident solar energy admitted through a window or glazed assembly as heat.
An energy measure that includes energy used upstream to produce and deliver the energy consumed at a building.
A financing summary matching the capital expected to fund a project with the expenditures that capital is intended to cover.
Code-required inspections or tests of specified work by qualified parties under the applicable jurisdiction’s rules.
A focused technical review used when a general assessment identifies a condition requiring deeper analysis, testing, or discipline-specific expertise. Its scope should address a defined question.
Written requirements describing materials, performance, execution, and other criteria for the work.
A defined stage at which a property is considered to have reached a sustainable operating level, often measured by occupancy and income criteria.
Project materials purchased but not yet permanently installed. They may be stored on site or at another location, subject to the project’s payment and financing conditions.
A site-specific plan describing how construction stormwater pollution will be prevented and managed under the applicable permit.
A focused evaluation of structural conditions or performance for a defined purpose.
An agreement under which a contractor engages another party to perform an identified portion of its work.
Product data, shop drawings, samples, or other information submitted for review under the construction documents.
Debt whose payment or enforcement rights rank behind another obligation under the governing arrangements.
A contract-defined stage at which the work is sufficiently complete for its intended use or occupancy, subject to the governing contract and required certifications. It is not necessarily final completion.
A proposed replacement for a specified product, system, or method.
Project-specific provisions that add to or modify the general conditions of a construction contract.
Initial activation and checkout of installed equipment or systems before regular operation.
Financing intended to replace an earlier loan, commonly permanent financing replacing a construction or bridge loan.
Work adapting leased space for a tenant’s use, ranging from finishes to substantial building-system changes.
A location where heat flows more readily through an assembly because of a conductive material or a break in insulation continuity.
A payment arrangement based on documented labor time, materials, and other agreed charges rather than solely a fixed total.
A New York City filing and sign-off framework for required energy-code progress inspections. Applicable inspection categories and responsibilities depend on the approved project filing.
A record identifying documents, samples, or other items sent from one project participant to another.
Clear space allowing a wheelchair user to change direction under the applicable accessibility criteria.
A measure of heat transfer through a material or assembly; lower values indicate less heat transfer for the same basis.
A tank system located wholly or partly below ground, often used to store petroleum or other substances. Regulatory definitions determine which systems are covered.
The portion of a loan commitment that has not yet been advanced.
A contract pricing work by an agreed rate per measured unit rather than solely by one fixed total.
The life-cycle inputs used to forecast when building components may need repair or replacement. They link a current condition assessment to an anticipated capital schedule.
Evaluation of alternatives intended to improve value while maintaining required functions and performance.
A condition involving the presence or likely presence of contaminant vapors in the subsurface of a property due to a release from contaminated soil or groundwater.
Movement of vapors from a subsurface source into an overlying or nearby building.
A material or layer that limits water-vapor diffusion through an assembly.
A difference between a planned or reported value and a comparison value, such as actual cost, observed progress, or the current schedule forecast. The term needs a stated basis.
A visual observation of accessible property areas and systems within a defined assessment scope.
Unintended entry or movement of water into a building assembly or occupied space. It may arise from the exterior, plumbing, groundwater, or other sources.
A system intended to resist water penetration under the exposure conditions for which it is designed.
Adjustment of energy results to account for weather differences when comparing periods or conditions.
Construction that has been installed or performed at the project, distinguished from materials merely procured or stored.
Review of a property’s use and development characteristics against the applicable land-use framework and available records.
A report organizing applicable land-use information, property characteristics, and identified conformance questions for a specified transaction or purpose.
Put the terms to work
Find government permit, inspection, zoning, property, and environmental resources by location.
Open the Public Records Resource Finder →NYC Local Laws
Select NYC Local Laws in the directory to explore inspections, construction safety, energy, housing, and code changes. This is a curated building-focused reference—not an exhaustive legal register or a substitute for a property-specific compliance review. NYC laws are distinct from New York State requirements. Each entry links to City sources and includes a practical example.
Looking for a report or service?
These report names link directly to the corresponding service, including its purpose and deliverables.
Field observations and document review supporting construction funding decisions.
Explore the service →Environmental due diligence combining records, property history, site reconnaissance, and interviews within the agreed assessment scope.
Explore the service →Review of a property’s major systems, visible deficiencies, and anticipated capital needs.
Explore the service →Property condition and capital-needs review under the applicable Fannie Mae program and lender requirements.
Explore the service →Property condition and capital-needs review under the applicable Freddie Mac program and lender requirements.
Explore the service →A program-specific environmental determination supporting certain housing rehabilitation and public-financing processes.
Explore the service →Start a conversation
Tell us what you’re working on. Our team will help define the right scope and get a proposal moving.