Attic stock
Spare materials retained or furnished for future maintenance and replacement, often matching the installed products.
Why it matters
Required quantities, labeling, storage, and handover should be checked against the specifications. Excess material left on site does not automatically satisfy the requirement. Confirm receipt by the owner rather than treating shipment as completed handover.
In practice
A project example
Closeout requires labeled replacement ceiling tiles from the installed product line.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.