Are ADA and Fair Housing Act requirements interchangeable?+
No. They have different coverage and technical frameworks. A multifamily property may have obligations affecting public areas, common areas, or dwelling units under different laws.
Does a limited PCA accessibility screening replace a detailed review?+
No. A screening identifies potential concerns within a limited scope. A detailed plans or field review needs its own basis, access, measurements, and deliverables.
Can an alteration create new accessibility obligations?+
Yes. The affected work and governing law determine the obligations. Evaluate the proposed alteration and associated routes before design and pricing are finalized.
Which accessibility requirements does KOW review?+
The review basis is project-specific. Location, facility use, new construction or alteration scope, public or private operation, housing type, funding sources, governing code, program requirements, and client instructions can affect which laws, codes, and technical standards are included.
Why combine plan review with field observations?+
A compliant design can be changed by coordination, substitutions, finish thickness, mounting, grading, hardware, workmanship, or a repeated installation. Reviewing selected construction milestones helps the team address those conditions while correction is still practical.
When should an accessibility consultant join the project?+
Early enough to establish the review basis and resolve recurring details before procurement, mockups, rough framing, grading, concealment, and finish installation. The right milestones depend on the project and construction sequence.
Does KOW replace the architect, engineer, contractor, code official, or special inspector?+
No. KOW provides the advisory review and observations defined in the engagement. The project’s design professionals, contractors, owners, authorities, and other responsible parties retain their respective design, construction, filing, inspection, and approval obligations.