Construction · Defined
Specifications
Written requirements describing materials, performance, execution, and other criteria for the work.
Why it matters
Specifications and drawings work together. A quantity-based budget can miss a required testing, warranty, or performance obligation that appears only in the written requirements.
In practice
A project example
The drawings show a roof assembly while the specifications define its testing and warranty obligations.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
