Construction · Defined

Record drawings

Drawings documenting the completed work based on the information and verification process specified for their preparation.

Why it matters

The label does not establish that every concealed condition was surveyed. Distinguish contractor-marked records from independently verified as-built information.

In practice

A project example

A recorded utility route is useful for maintenance, but field confirmation may still be needed before excavation.