KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Existing buildings · Defined

Condensation

The change of water vapor to liquid water when local temperature and moisture conditions permit it.

Why it matters

A wet surface does not always indicate rain leakage. Distinguishing condensation from other sources is essential before choosing a repair.

In practice

A project example

Moisture on cold piping appears during humid conditions even though no pipe leak is present.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.