Existing buildings · Defined
Thermal bridge
A location where heat flows more readily through an assembly because of a conductive material or a break in insulation continuity.
Why it matters
Thermal bridges can affect energy use and interior surface temperatures. Adding nominal insulation does not necessarily correct a highly conductive connection.
In practice
A project example
A slab edge conducts heat through an otherwise insulated exterior wall.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
