Existing buildings · Defined
Water intrusion
Unintended entry or movement of water into a building assembly or occupied space. It may arise from the exterior, plumbing, groundwater, or other sources.
Why it matters
A condition report should distinguish observed moisture evidence from an established cause. Duration, affected materials, hidden conditions, and occupant concerns influence the next investigation. Repainting a stained surface does not demonstrate that the source was corrected.
In practice
A project example
A ceiling stain documented during a walk-through warrants questions about repair history and current conditions; testing or opening concealed construction may require a separately defined scope.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
