KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Existing buildings · Defined

Deferred maintenance

Repair or replacement work that has been postponed. Its significance depends on the affected component, the consequence of further delay, and the property’s operating needs.

Why it matters

A worn finish and an active roof leak are not equivalent simply because both need attention. A condition assessment separates urgent deficiencies from routine work and longer-term renewals so lenders, owners, and investors can plan an appropriate response.

In practice

A project example

Repeatedly patching a deteriorated roof may postpone replacement while allowing moisture damage to grow. The report should address both the roof and the resulting conditions.

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.