KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Existing buildings · Defined

Air barrier

A connected system of materials and joints controlling unintended airflow through the building enclosure.

Why it matters

Air control and vapor diffusion control are different functions. Penetrations and transitions can dominate performance even when the specified field material is suitable. Review continuity across trade boundaries rather than treating each product as an isolated solution.

In practice

A project example

An enclosure test identifies leakage at transitions between windows and adjacent walls.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.