Accessibility · Defined
Running slope
The slope measured in the direction of travel along a route or ramp.
Why it matters
It differs from cross slope, which is measured across the route. Surface transitions and landings require separate attention under the governing criteria.
In practice
A project example
A walkway’s longitudinal grade is acceptable under the selected criterion, but excessive cross slope remains a concern.
Technical references
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
