KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Accessibility · Defined

Ramp landing

A relatively level area associated with a ramp run that supports stopping, maneuvering, or changing direction.

Why it matters

Landing dimensions and slopes depend on applicable requirements and adjoining features. A nearby door can introduce additional clearance needs.

In practice

A project example

A ramp ends at a door, so both landing geometry and door maneuvering space need review.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.