Maneuvering clearance

Space needed to approach, open, and pass through a door or other element as defined by the applicable accessibility requirements.

Why it matters

The approach direction, door swing, hardware, and surrounding obstructions affect the configuration. Door width alone does not establish accessible passage.

In practice

A project example

A cabinet blocks the latch-side space needed to use a door.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.