Accessibility · Defined

Turning space

Clear space allowing a wheelchair user to change direction under the applicable accessibility criteria.

Why it matters

It is different from a fixture’s clear floor space or a door’s maneuvering clearance. Permitted overlaps and obstructions must be checked for the particular configuration.

In practice

A project example

A restroom layout provides space at a fixture but still lacks the required turning arrangement.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.