Accessibility · Defined
Accessible route
A connected route meeting the applicable accessibility requirements between the spaces and elements it serves. Compliance depends on the complete route, not just an isolated ramp or doorway.
Why it matters
Review changes in level, clearances, surfaces, doors, and connections under the governing standard. The route must also coordinate with the actual site and building layout. A compliant detail can still fail to connect the required destinations.
In practice
A project example
An accessible parking space is not enough if the path from that space to the building entrance contains an unresolved barrier.
Technical references
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.