Accessibility · Defined
Cross slope
The slope measured perpendicular to the direction of travel. It is distinct from the running slope along the route.
Why it matters
A route can have a modest running slope but an excessive cross slope under the governing accessibility criteria. Review the grading information and relevant constructed conditions; one slope note does not necessarily describe the whole route.
In practice
A project example
A sidewalk transitions around a driveway. The review needs to consider the pedestrian route across the transition, not only the driveway’s vehicle access.
Technical references
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
