Environmental · Defined
Detection limit
A method-dependent level associated with the ability to distinguish an analyte from background or analytical noise.
Why it matters
A nondetect does not mean absolute absence. Detection and reporting limits, units, and qualifiers must be understood before comparing results with screening criteria.
In practice
A project example
An analytical limit above the relevant screening level leaves the intended comparison unresolved.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
