KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Existing buildings · Defined

Load path

The connected sequence of structural elements carrying forces through a building to its foundations and supporting ground.

Why it matters

Connections and interfaces matter as much as individual members. A discontinuity can affect performance even where the visible beam or wall appears intact.

In practice

A project example

A proposed opening interrupts a wall that transfers loads between floors, requiring an engineered solution.

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.