Construction · Defined

Nonconforming work

Work that does not meet an applicable contract requirement, approved detail, or specified criterion.

Why it matters

Document the condition and the responsible reviewer’s disposition. A proposed repair, acceptance, or credit should not be assumed to resolve it until properly authorized.

In practice

A project example

An installed product differs from the specified product and requires design-team review.