Local Law 94 of 2019: Sustainable roofing zones

Establishes sustainable roofing zone provisions for covered new construction and roof work, read together with Local Law 92 of 2019.

New York City jurisdiction · Sources checked September 15, 2026. Law numbers repeat by year. These educational summaries are not legal advice or a complete compliance checklist. Later amendments, agency rules, building characteristics, and effective dates determine the requirements for a particular property. Use the linked City sources to confirm current obligations.

Why it matters

A sustainable roofing zone may use solar panels, planted roofing, or both, subject to the applicable exclusions and exceptions. The design team should determine coverage from the actual scope and code requirements, not from the building’s gross roof area alone.

In practice

A project example

A developer incorporates the required roof strategy during schematic design so mechanical equipment and access routes do not consume space assumed available for solar or planting.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.