Environmental · Defined
Exposure pathway
The route by which a contaminant can move from a source to a person or other receptor.
Why it matters
Presence of a substance and an actual exposure pathway are different questions. Site use, building conditions, and environmental transport determine what needs further evaluation.
In practice
A project example
Contaminated soil below a paved area presents different exposure considerations if the site is later excavated.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
