Environmental · Defined
Engineering control (environmental)
A physical measure designed to contain contamination or reduce exposure, such as a cap or a vapor-control system.
Why it matters
The measure can require inspection, maintenance, and limits on disturbance. Construction planning should account for preserving or modifying it through an approved process.
In practice
A project example
A pavement cap cannot be excavated for new utilities without considering the site’s management requirements.
Technical references
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
