KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Existing buildings · Defined

Mechanical, electrical, and plumbing (MEP)

The building systems associated with environmental conditioning, electrical distribution, and water supply and drainage.

Why it matters

Their interfaces influence both construction sequencing and operating performance. A coordinated design and completed installation still need appropriate startup and testing.

In practice

A project example

A mechanical unit is delivered, but the available electrical service does not match its requirements.

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.