NYC Local Laws · Defined

Local Law 148 of 2021: Cold-formed steel construction safety

Amends NYC construction safety provisions concerning cold-formed steel construction.

New York City jurisdiction · Sources checked September 15, 2026. Law numbers repeat by year. These educational summaries are not legal advice or a complete compliance checklist. Later amendments, agency rules, building characteristics, and effective dates determine the requirements for a particular property. Use the linked City sources to confirm current obligations.

Why it matters

Light-gauge steel work still requires a deliberate safety and erection approach. The applicable provisions should be coordinated with the contractor’s means and methods, sequence, and temporary conditions. A permanent structural design does not by itself describe how every stage of assembly will be stabilized.

In practice

A project example

A project using cold-formed framing reviews erection sequencing and temporary safeguards before construction, rather than treating the finished framing drawings as the complete installation plan.