Knee and toe clearance

Unobstructed space beneath certain elements that permits an accessible approach where required.

Why it matters

The required profile is not simply an open-looking area below a counter. Pipes, supports, and protective covers can reduce the usable space. Review the complete installed configuration and the governing dimensions rather than relying only on a fixture specification.

In practice

A project example

A sink cabinet is removed, but exposed piping still interferes with the required approach.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.