KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Construction · Defined

Design-build

Project delivery in which the owner contracts with one entity for both design and construction of the agreed scope.

Why it matters

A single contractual point does not remove scope, performance, or approval risks. Review the owner’s requirements and design development assumptions alongside the price.

In practice

A project example

The design-builder coordinates the architect and trades while the owner reviews agreed performance milestones.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.