Is Freddie Mac’s unit sample the same as Fannie Mae’s?+
No. Their published instructions define samples differently. Confirm the lender, product, and applicable guide before scheduling access; do not reuse another agency’s inspection checklist.
Are commercial spaces included in a multifamily report?+
Chapter 62 calls for inspection of all commercial units. Mixed-use buildings therefore need tenant coordination beyond the residential sample.
What if the minimum sample shows inconsistent conditions?+
Additional observations or supporting investigation may be needed to establish the extent of the problem and a supportable cost. The minimum is not a reason to stop when the evidence remains unclear.
Is this the same as a construction progress report?+
No. An existing-property PCR evaluates condition and capital needs. Construction monitoring evaluates ongoing work and funding. A transaction with rehabilitation may need both, with their scopes and assumptions coordinated.
What makes a Freddie Mac physical due-diligence report different?+
The report follows the applicable Freddie Mac program and lender requirements in addition to documenting observable condition, priority repairs, expected replacements, supporting information, and material limitations.
Does every Freddie Mac assignment use one identical scope?+
No. Program, transaction, form, reliance, specialist, and lender-review requirements can differ. KOW confirms the current assignment requirements before the scope is finalized.
How are future costs presented?+
Replacement needs are organized over the required analysis period using observed condition, available records, expected useful life, stated cost assumptions, and the applicable reporting framework.