Construction · Defined
Work in place
Construction that has been installed or performed at the project, distinguished from materials merely procured or stored.
Why it matters
Visible work should be assessed within the limits of the observation. Covered work, testing, and concealed connections may require separate records; seeing equipment does not establish that it operates.
In practice
A project example
Air-handling units are installed, but electrical connections and functional testing remain outstanding.