KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Environmental · Defined

Underground storage tank (UST)

A tank system located wholly or partly below ground, often used to store petroleum or other substances. Regulatory definitions determine which systems are covered.

Why it matters

Tank presence, release history, and closure status are separate issues. A removed tank can still warrant investigation if surrounding contamination or documentation gaps remain.

In practice

A project example

An old plan depicts a fuel tank that is absent from current records, prompting a request for removal and closure documentation.

Technical references

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.