KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Environmental · Defined

Groundwater

Water present in saturated subsurface soil or rock.

Why it matters

Its depth and movement influence environmental investigation and construction planning. Conditions at one boring or one date may not represent the entire property or seasonal range. Distinguish a measured water level from an interpreted direction of flow and identify the supporting observations.

In practice

A project example

A proposed excavation extends below observed groundwater and needs a coordinated dewatering and environmental approach.

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.