Construction · Defined
Constructability review
Evaluation of whether the proposed design can be built effectively given sequencing, access, coordination, methods, and site constraints.
Why it matters
Identify practical conflicts before procurement and installation. This review does not replace the designers’ responsibilities or the contractor’s means-and-methods obligations.
In practice
A project example
Equipment fits in the mechanical room, but the planned delivery route is too narrow after the walls are closed.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
