KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Existing buildings · Defined

Fire-resistance rating

A measure of an assembly’s fire performance established through an applicable test or approved design method.

Why it matters

The rating belongs to an assembly, not just a material label. Altered connections, penetrations, or protective layers can affect the intended performance.

In practice

A project example

A rated wall is compromised by an unprotected opening added during a tenant renovation.

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.