Waterproofing

A system intended to resist water penetration under the exposure conditions for which it is designed.

Why it matters

Below-grade walls, terraces, and roofs face different conditions. Confirm drainage, joints, penetrations, and protection of the system rather than treating a coating as a complete solution.

In practice

A project example

A terrace membrane repair must address the door threshold and drain connections where leakage is occurring.

General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.