Existing buildings · Defined
Physical deficiency
A condition affecting a building component or system that warrants repair, replacement, or further evaluation within the assessment scope.
Why it matters
Describe the observed condition and consequence rather than relying on a vague rating. A physical deficiency can exist even when the affected system is still operating.
In practice
A project example
A roof remains in service but has open seams and recurring leakage that require attention.
General educational guidance from KOW Building Consultants. Examples are illustrative, not project records. The applicable contract, standard, program, and jurisdiction control the requirements for a specific assignment.
