Commissioning establishes what selected systems are expected to do, then documents whether the installed systems can do it. Equipment startup is only one part of that process. The building also needs coordinated controls, functional testing, usable documentation, and a clear record of unresolved issues.
Scope, requirements & reporting
Requirements and reporting details.
Start with the owner’s requirements
ASHRAE Guideline 0 and Standard 202 provide a framework for commissioning new buildings and systems. The Owner’s Project Requirements describe the performance the owner expects; the Basis of Design explains the design response. The commissioning plan assigns responsibilities and establishes how performance will be verified.
Define functional tests and acceptance criteria
A system may start successfully yet fail to respond correctly to schedules, sensors, load changes, or other systems. The scope should establish operating modes, acceptance criteria, required records, issue resolution, and any deferred seasonal testing. KOW can coordinate design review, observations, functional testing, and the resulting documentation.
Distinguish owner, code, and certification scopes
An owner’s commissioning scope, an energy-code requirement, and a green-building certification requirement can overlap without being identical. Existing-building retro-commissioning also has a different starting point from new construction. Confirm the governing requirements and covered systems before assigning responsibilities or pricing the work.
What the work should document
The commissioning record should include the agreed requirements, selected systems, test procedures, observed results, issues log, corrections, retesting, and remaining seasonal tests. A signed equipment startup sheet is not evidence that interacting systems respond correctly under different operating conditions. Establish responsibility for controls adjustments and corrective work in advance.
KOW in the fieldDesign intent · Installation · Functional testing · Issue tracking
Your questions
Questions the report addresses.
01
Are the systems installed and operating according to project requirements?
02
What deficiencies or coordination issues remain?
03
Are testing, documentation, and operator training complete?
04
What corrective actions should be tracked through closeout?
Typical scope
What the review covers.
We confirm the final scope based on the property, transaction, program, your requirements, and available information. The work typically includes:
Commissioning-plan support
Design and submittal review
Installation observations
Functional-performance coordination
Issues log and resolution tracking
Final commissioning documentation
Process
How we do the work.
01
Set the assignment
Confirm the property or project, how the report will be used, who will rely on it, the schedule, available information, and the required deliverable.
02
Read the record
Review the documents, identify missing information, and arrange the people and site access needed for the work.
03
Do the field and technical work
Complete the observations, analysis, interviews, and specialist coordination required for the assignment.
04
Report what matters
Explain the significant findings, what supports them, the limits of the review, and any open items or recommended follow-up.
Common assignments
When clients use this service.
New construction
Commissioning support from design review through functional testing and closeout.
Existing building
Investigation of operational issues and opportunities to improve system performance.
Program or compliance scope
Documentation and verification organized around applicable requirements.
Frequently asked
Frequently asked questions.
What is the difference between startup and functional testing?+
Startup establishes that equipment can operate. Functional testing evaluates the specified sequences and responses, including how components work together under relevant modes and conditions.
Is testing, adjusting, and balancing the same as commissioning?+
No. TAB establishes and documents system flows and balance. Commissioning uses relevant records and testing to evaluate broader functional performance; the scopes should be coordinated.
What happens when a test fails?+
Record the condition and acceptance criterion, assign correction responsibility, and retest as required. Identify unresolved issues in the final report.
Can testing be completed before the right season?+
Some checks may need deferred seasonal testing. Document the tests that remain, when they will be performed, and who is responsible.
What does building commissioning verify?+
Commissioning reviews and documents whether selected systems are designed, installed, started, controlled, tested, and capable of operating in accordance with the agreed project requirements.
When should commissioning begin?+
Early involvement gives the team time to agree on commissioning requirements, assign responsibilities, and plan testing and documentation.