KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Energy and water performance

Energy Audits

Building energy-use analysis and energy conservation recommendations for capital planning, Local Law 87 assignments, and NYSERDA FlexTech studies.

Request a proposal

In plain terms

Measure building performance and explain where energy is being used.

An energy audit examines building systems, operations, and utility use to develop energy conservation measures. KOW defines the scope around the intended assignment, including Local Law 87 audits and FlexTech studies. Local Law 84 benchmarking is a separate service.

Scope, requirements & reporting

Requirements and reporting details.

Choose the appropriate ASHRAE audit level

ASHRAE Standard 211 defines procedures for Level 1, 2, and 3 audits. Level 1 provides an initial assessment; Level 2 develops a more detailed analysis of measures and economics; Level 3 provides deeper analysis of selected capital measures. The assignment should name the level, systems, data requirements, and intended investment decision.

Separate the performance baseline from the compliance submission

For NYC buildings subject to Local Law 84, annual benchmarking is a reporting obligation. Local Law 87 adds audit and retro-commissioning requirements for its covered buildings. The two laws have different applicability rules, so a benchmarking requirement alone does not establish that an LL87 report is due.

Evaluate savings with the assumptions visible

Useful recommendations identify the existing equipment, proposed change, estimated energy and cost savings, implementation cost, and operational dependencies. Fuel prices, hours of use, occupancy, and interactions between measures can materially change the result. KOW’s scope can bring these assumptions into the owner’s capital discussion.

What the work should document

An audit report should identify the data period, occupied areas, equipment and operating schedules, observed deficiencies, proposed measures, and calculation assumptions. For each measure, distinguish energy savings from dollar savings, document the cost basis, and explain interactions with other measures. Savings from individual measures cannot always be added together without adjustment.

Existing Building Due Diligence consulting
KOW in the fieldUtility data · Systems · Operations · Opportunities

Decisions supported

Questions the report addresses.

  1. 01

    Is the available building-performance data complete and reliable?

  2. 02

    Which systems or operating conditions are driving performance?

  3. 03

    What measures warrant technical or financial development?

  4. 04

    How should opportunities be coordinated with capital work and compliance deadlines?

Typical scope

What KOW reviews and documents.

The final scope follows the property, transaction, program, client requirements, and information available. Typical elements include:

Utility-data and benchmarking review
Building and system observations
Energy-use analysis
Energy conservation measure identification
Savings and implementation considerations
Compliance or program documentation as applicable

Process

How the assignment is carried out.

01

Set the assignment

Confirm the property or project, intended use, reliance parties, schedule, available information, and required deliverable.

02

Read the record

Review the documents, identify gaps, and coordinate the people and access needed to complete the scope.

03

Do the field and technical work

Perform the observations, analysis, interviews, and specialist coordination called for by the assignment.

04

Report what matters

Separate material findings from background information and state the basis, limitations, open items, and follow-up clearly.

Common assignments

Typical assignments.

Local Law 87

Energy audits coordinated with the required retro-commissioning and reporting scope.

FlexTech studies

Technical studies scoped around the project’s questions and applicable NYSERDA requirements.

Capital planning

Evaluation of energy conservation measures alongside planned building improvements.

Frequently asked

Frequently asked questions.

What is the difference between ASHRAE Levels 1, 2, and 3?

Level 1 provides an initial assessment; Level 2 develops more detailed measure and economic analysis; Level 3 adds deeper investigation of selected capital measures. ASHRAE Standard 211 provides the audit framework. Name the level and intended decision in the scope.

How much utility data is useful?

A complete annual cycle is essential for understanding seasonal use; additional history helps explain weather, occupancy, or operating changes. Confirm the program’s required period and include all relevant fuels and accounts.

Does a low ENERGY STAR score explain the cause?

No. It identifies relative performance where a score is available. Data errors, operating hours, building use, and equipment performance need investigation before selecting corrective work.

Are savings guaranteed?

An audit provides estimates based on stated assumptions. Actual results depend on installation, operation, weather, occupancy, and other factors. A measurement-and-verification scope is separate from the initial estimate.

What is the difference between benchmarking and an energy audit?

Benchmarking compares reported building performance over time or against peers. An energy audit examines systems, operations, and potential measures in greater technical detail.

What information should an owner prepare?

Utility data, occupancy and operating information, equipment records, controls information, prior studies, and planned capital projects can improve the usefulness of the analysis.

Start a conversation

Talk to us about energy audits.

Tell us what you’re working on. Our team will help define the right scope and get a proposal moving.

Request a proposal