How is an IPNA different from a PCA or CNA?+
A PCA focuses on physical condition; a CNA develops a capital-needs forecast. An IPNA integrates those needs with energy, water, and health assessment for an applicable preservation program. It is not simply a different name for the same report.
Does an IPNA satisfy Local Law 97 reporting?+
Not by itself. It can evaluate emissions and inform a reduction plan, but an LL97 submission has its own applicability, certification, and filing requirements. Include those separately in the engagement if needed.
Do all housing agencies accept the same provider and template?+
Do not assume so. NYSERDA publishes approved-provider information, including HCR-specific teams. Verify the program’s current provider, template, and submission requirements before commissioning the assessment.
Can we retain an old IPNA for a new financing application?+
Check the receiving agency’s age limits and update instructions. HPD’s moderate-rehabilitation guidance calls for an IPNA less than two years old at application. New work, changed utility use, or missing required analyses can also require an update.
Does the assessment include final retrofit design?+
No. The assessment identifies and compares needs and measures. Final engineering, utility coordination, permits, bids, and construction documents may be separate services after the owner selects the scope.
What is the relationship between IPNA and GPNA?+
Green physical-needs terminology varies between programs. Confirm the required deliverable by agency and template. Do not assume a report labeled GPNA automatically meets New York’s IPNA requirements.
What makes an IPNA integrated?+
While the assessment merges a traditional PNA with an energy audit, it also identifies housing-based health issues to be considered during rehabilitation or through maintenance and operation. In addition to this occupant health focus, the IPNA includes a solar PV screening tool, electrification-readiness analysis, and identifies flood and heat hazard exposure.
Can an IPNA inform a rehabilitation scope?+
Yes. Findings can help owners and financing partners organize priorities and evaluate how proposed rehabilitation, efficiency work, reserves, and long-term needs fit together.