Compare retrofit options before committing to design and construction.
A feasibility study tests a proposed investment against the building’s actual constraints. A promising efficiency measure may depend on electrical service, distribution temperatures, equipment space, structural capacity, tenant access, or a replacement project that has not yet been funded.
Scope, requirements & reporting
Requirements and reporting details.
Compare practical alternatives against one baseline
For a heating conversion, for example, compare continued operation, replacement, and electrification using the same occupancy and operating assumptions. Examine distribution, domestic hot water, utility capacity, and phasing. Record what has been verified and what still requires survey, engineering, or utility confirmation.
Evaluate cost, emissions, and implementation together
Energy savings, utility-cost savings, and emissions reductions are different measures. A project should be assessed against the owner’s objectives, applicable emissions requirements, capital budget, and operating constraints. The study should identify dependencies and decision points before detailed design or procurement.
Check technical-assistance funding early
NYSERDA’s FlexTech program can share eligible technical-study costs; it does not fund implementation of measures identified by the study. Eligibility, scope approval, and timing need to be checked before assuming reimbursement. KOW can coordinate the study scope and documentation with the owner’s program review.
What the work should document
A feasibility report should define the baseline and alternatives, identify capacity and space constraints, estimate capital and operating costs, explain savings and emissions assumptions, and set out unresolved investigations. Include implementation dependencies such as utility service, distribution changes, temporary systems, resident access, and equipment lead times.
KOW in the fieldExisting conditions · Options · Costs · Implementation
Your questions
Questions the report addresses.
01
Is the proposed measure technically appropriate for the property?
02
What constraints, dependencies, or enabling work affect implementation?
03
What level of cost, disruption, and performance impact should be anticipated?
04
What design, testing, or funding steps are needed next?
Typical scope
What the review covers.
We confirm the final scope based on the property, transaction, program, your requirements, and available information. The work typically includes:
Existing-condition review
Opportunity and constraint analysis
Conceptual measure development
Preliminary cost and impact considerations
Program and incentive screening
Recommended next steps
Process
How we do the work.
01
Set the assignment
Confirm the property or project, how the report will be used, who will rely on it, the schedule, available information, and the required deliverable.
02
Read the record
Review the documents, identify missing information, and arrange the people and site access needed for the work.
03
Do the field and technical work
Complete the observations, analysis, interviews, and specialist coordination required for the assignment.
04
Report what matters
Explain the significant findings, what supports them, the limits of the review, and any open items or recommended follow-up.
Common assignments
When clients use this service.
Electrification planning
Early analysis of building systems, capacity, phasing, and supporting work.
Major equipment replacement
Comparison of options before committing to a design for planned capital work.
Incentive or funding pursuit
Technical basis for determining whether a proposed project should advance into a program application.
Frequently asked
Frequently asked questions.
Is a feasibility study a construction-ready design?+
No. It supports selection of a direction. Detailed engineering, utility approvals, permits, specifications, and contractor pricing may be needed next.
Can an electrification study assume the existing electrical service is adequate?+
It should not. Document available service information and identify load analysis or utility confirmation needed before selecting equipment and finalizing cost.
Why compare more than simple payback?+
Payback does not capture every constraint or objective. Condition, service life, financing, operating cost exposure, emissions obligations, and occupant impact can affect the decision.
Can NYSERDA help fund the study?+
Potentially, through an applicable technical-assistance program such as FlexTech. Eligibility, application timing, and approved scope must be confirmed; study support is not the same as construction funding.
What should a retrofit feasibility study answer?+
It should describe existing conditions, compare realistic options, identify dependencies and constraints, and provide enough information about costs, performance, and implementation to help the owner decide whether to proceed.
Is a feasibility study a construction design?+
No. It is an early planning analysis. Selected measures normally require further engineering, design, permitting, procurement, and field verification before construction.