Measure building performance and explain where energy is being used.
An energy audit examines building systems, operations, and utility use to develop energy conservation measures. KOW defines the scope for the work needed, including Local Law 87 audits and FlexTech studies. Local Law 84 benchmarking is a separate service.
Scope, requirements & reporting
Requirements and reporting details.
Choose the appropriate ASHRAE audit level
ASHRAE Standard 211 defines procedures for Level 1, 2, and 3 audits. Level 1 provides an initial assessment; Level 2 develops a more detailed analysis of measures and economics; Level 3 provides deeper analysis of selected capital measures. Specify the audit level, systems, data requirements, and intended use of the results in the scope.
Separate the performance baseline from the compliance submission
For NYC buildings subject to Local Law 84, annual benchmarking is a reporting obligation. Local Law 87 adds audit and retro-commissioning requirements for its covered buildings. The two laws have different applicability rules, so a benchmarking requirement alone does not establish that an LL87 report is due.
State the assumptions behind savings estimates
Recommendations should identify the existing equipment, proposed change, estimated energy and cost savings, implementation cost, and operational dependencies. Fuel prices, hours of use, occupancy, and interactions between measures can materially change the result. KOW can review these assumptions with the owner when planning capital work.
What the work should document
An audit report should identify the data period, occupied areas, equipment and operating schedules, observed deficiencies, proposed measures, and calculation assumptions. For each measure, distinguish energy savings from dollar savings, document the cost basis, and explain interactions with other measures. Savings from individual measures cannot always be added together without adjustment.
KOW in the fieldUtility data · Systems · Operations · Opportunities
Your questions
Questions the report addresses.
01
Is the available building-performance data complete and reliable?
02
Which systems or operating conditions account for the building’s energy use?
03
Which measures need further technical or financial analysis?
04
How should opportunities be coordinated with capital work and compliance deadlines?
Typical scope
What the review covers.
We confirm the final scope based on the property, transaction, program, your requirements, and available information. The work typically includes:
Utility-data and benchmarking review
Building and system observations
Energy-use analysis
Energy conservation measure identification
Savings and implementation considerations
Compliance or program documentation as applicable
Process
How we do the work.
01
Set the assignment
Confirm the property or project, how the report will be used, who will rely on it, the schedule, available information, and the required deliverable.
02
Read the record
Review the documents, identify missing information, and arrange the people and site access needed for the work.
03
Do the field and technical work
Complete the observations, analysis, interviews, and specialist coordination required for the assignment.
04
Report what matters
Explain the significant findings, what supports them, the limits of the review, and any open items or recommended follow-up.
Common assignments
When clients use this service.
Local Law 87
Energy audits coordinated with the required retro-commissioning and reporting scope.
FlexTech studies
Technical studies scoped around the project’s questions and applicable NYSERDA requirements.
Capital planning
Evaluation of energy conservation measures alongside planned building improvements.
Frequently asked
Frequently asked questions.
What is the difference between ASHRAE Levels 1, 2, and 3?+
Level 1 provides an initial assessment; Level 2 develops more detailed measure and economic analysis; Level 3 adds deeper investigation of selected capital measures. ASHRAE Standard 211 provides the audit framework. Specify the audit level and purpose in the scope.
How much utility data is useful?+
A complete annual cycle is essential for understanding seasonal use; additional history helps explain weather, occupancy, or operating changes. Confirm the program’s required period and include all relevant fuels and accounts.
Does a low ENERGY STAR score explain the cause?+
No. It identifies relative performance where a score is available. Data errors, operating hours, building use, and equipment performance need investigation before selecting corrective work.
Are savings guaranteed?+
An audit provides estimates based on stated assumptions. Actual results depend on installation, operation, weather, occupancy, and other factors. A measurement-and-verification scope is separate from the initial estimate.
What is the difference between benchmarking and an energy audit?+
Benchmarking compares reported building performance over time or against peers. An energy audit examines systems, operations, and potential measures in greater technical detail.
What information should an owner prepare?+
Utility data, occupancy and operating information, equipment records, controls information, prior studies, and planned capital projects can improve the usefulness of the analysis.