KOW webinar series · Free fall sessions for the industryREGISTER NOW
Construction & real estate due diligenceNational Reach. Local Insight.

Building energy analysis

Energy Modeling

Energy models that compare design alternatives and document assumptions for project planning, code, and certification scopes.

Request a proposal

In plain terms

Energy Modeling

KOW develops energy models to evaluate how envelope, mechanical systems, lighting, controls, and operating assumptions affect projected energy use. The scope identifies the modeling method, baseline, alternatives, and intended decision.

Model results support comparison and documentation. They are estimates based on the stated inputs; the report identifies assumptions, design revisions, and information that remains to be confirmed.

Decisions supported

Questions the report addresses.

  1. 01

    Which design alternatives best support the project’s energy objectives?

  2. 02

    What assumptions drive the projected results?

  3. 03

    What documentation does the selected code or certification pathway require?

Typical scope

What KOW reviews and documents.

The final scope follows the property, transaction, program, client requirements, and information available. Typical elements include:

Modeling scope and baseline definition
Design-input and assumption record
Baseline and proposed-case energy models
Comparison of selected design alternatives
Results and limitations summary
Program or certification documentation within scope

Process

How the assignment is carried out.

01

Define the pathway

Confirm the property, project stage, objectives, program, and responsibilities.

02

Develop the technical work

Review project information and coordinate the analysis, observations, and documentation in the agreed scope.

03

Review and document

Resolve comments, record findings, and prepare the deliverables for the next project milestone.

Common assignments

Typical assignments.

Design comparison

Evaluate selected envelope and system options while the design can still respond.

Program documentation

Modeling aligned with the agreed code, incentive, or certification pathway.

Start a conversation

Talk to us about energy modeling.

Tell us what you’re working on. Our team will help define the right scope and get a proposal moving.

Request a proposal