top of page

Weather-based irrigation controller WBIC
A weather-based irrigation controller, or WBIC, adjusts watering schedules based on local weather conditions, ensuring efficient water usage. These smart systems conserve water by delivering the right amount of moisture needed for landscaping.
bottom of page