top of page
  • Instagram
  • LinkedIn
KOW Building Consultants_0827-BW.jpg

Tilt Plates

Tilt plates are metal plates that can be attached to an existing structure. They have protruding knobs that allow for the engineer to take readings on the degree to which the plate diverges from vertical or horizontal in two directions. Changes in wall tilt can be measured to determine if a given structure is in equilibrium or if moves over time.

bottom of page