top of page

Scenario Expected Loss (SEL)
The Scenario Expected Loss (SEL), is one way to express the Probable Maximum Loss value. The Scenario Expected Loss is the expected average damage of a buidling during a seismic event. Another way to express the PML value is the Scenario Upper Loss (SUL).
bottom of page