top of page
  • Instagram
  • LinkedIn
KOW Building Consultants_0827-BW.jpg

Replacement Reserves Table

The Replacement Reserves Table is one of two tables included in a Property Condition Report, which identifies long-term capital expenses (typically within the next 12 years) that are typically based on the expected useful life of the building systems and components. Examples of replacement reserve items include pavement seal coating and striping, exterior painting, or HVAC system replacements.

bottom of page