top of page

Moisture Content
The moisture content of soil is the weight of the water in the soil divided by the weight of the dry soil particles. This is measured by weight a soil sample in its natural state, then placing it in a scientific oven with circulated air at a precise temperature until it reaches a constant mass. Once the constant or “dried” mass is known, the moisture content can be calculated as a percentage.
bottom of page