top of page
  • Instagram
  • LinkedIn
KOW Building Consultants_0827-BW.jpg

Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys






Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys are guidelines for performance for ALTA/NSPS Land Title Surveys. They were developed (first 1962 and revised 8 times since – most recently effective February 23, 2016). The new standards will be effective on February 23, 2021.





bottom of page