top of page

Measured Survey
A Measured Survey is a survey that provides accurate measurements and drawings of a building’s layout, including floor plans, elevations, and sections.
bottom of page
A Measured Survey is a survey that provides accurate measurements and drawings of a building’s layout, including floor plans, elevations, and sections.