top of page

Lot Width
Lot width is the mean horizontal distance between the side lot lines of a lot. This is often applied at the frontage of a property to regulate the minimum length of a lot that abuts a street line.
bottom of page
Lot width is the mean horizontal distance between the side lot lines of a lot. This is often applied at the frontage of a property to regulate the minimum length of a lot that abuts a street line.