top of page

Load-Bearing Components
Load-Bearing Components are those components that extend beyond the exterior walls of the building to deliver structural loads from the exterior elevated element to the building.
bottom of page
Load-Bearing Components are those components that extend beyond the exterior walls of the building to deliver structural loads from the exterior elevated element to the building.