top of page

Lease Entrance/Exit Condition Assessment (LECA)
A LECA is a commercial building inspection specifically designed to assess the condition of a property at the commencement or termination of a lease. All major improvements and building systems are included in the assessment, which culminates in a report that provides an accurate picture of the condition of the asset and an estimate of the costs required to resolve any deficiencies.
bottom of page